Sunday, November 18, 2007

CRACKING UP


Cracks have appeared in the surface - less than a year after the new footpath was installed to link Bigby High Road with Brigg Garden Centre.
The problems are on Lincolnshire County Council's side of the path, the stretch nearer to Brigg having been installed by the North Lincolnshire authority.
It took a long time for the two councils to get the pavement installed, prior to which Brigg people walking to and from town to the garden centre had to share the road with fast-moving vehicles.
A street light, or two, to illuminate the path wouldn't go amiss, either. And not just so people can avoid stepping on the cracked areas of path!

No comments: