We posted details about the roadworks recently, but now there's been an amendement issued.
The A1084 between Grasby and Clixby - on the main Brigg to Caistor route - will now be resurfaced from September 5 to September 9.
That means the roadworks have been brought forward from the original dates, which were September 9 to 12.
Lincolnshire County Council, the highway authority, tells us that three sections of the road, totalling 1173m, will be resurfaced using nearly 700 tonnes of Tarmac.
Highways manager Steve Wiles said: "We are taking this opportunity to resurface a large section of the road, rather than simply filling individual potholes. This will ensure the road remains in good condition for many more years and is a more cost-effective option. During the work we will have to close the road, but we will ensure access is maintained for residents who live along this stretch."
A diversion will be in place directing traffic via the A1084 Brigg Road, Bigby Hill, Bugby High Road, B1434 Howsam Road, Brigg Road, B1205 Station Road, Moortown Road, A46 Caistor Road, Nettleton Road, Caistor Bypass, Grimsby Road, A1173, A1084, High Street, Brigg Road.
No comments:
Post a Comment